Substation Installation

Design, procurement, construction & commissioning of 2x150MVA, 330/132kV and 2x60MVA, 132/33kV SG with double bus-bars and 1 1/2 CBS. Connection to new 330kV and existing 132kV transmission line.

Project Details

  • Date: 20.12.2004
  • Location: Ajaokuta, Nigeria
  • Value:
  • Category:Engineering, Procurement and Construction project
  • Client:TCN - Transmission Company of Nigeria

Transformer Installation

Lead Energy Electrical Equipment Company Limited has delivered and installed several units of 330/132/33kV 150MVA auto transformers, over 60 units of 132/33kV 60MVA power transformers and 4 units of 40MVA, 132/33kV Mobile Substations to the Transmission Company of Nigeria (TCN). They have all been commissioned and are in operation in various transmission substations in Nigeria.

Factory Acceptance Test

Lead Energy Electrical Equipment Company Limited has the capacity to carry out factory acceptance test, type test and special test for 500KV, 300MA, single phase transformers and 220KV 370MVA three pahse power transformers.